cannot drag and drop the widgets up and down the docking pane.
How can I change the order of widgets in the docking pane?
The Widget Dock does not have a feature that allows you to change the order of the widgets.
You could rename the widgets, using an initial - number, letter or symbol #%%26amp; to set up the order.
The problem with that method is, you may have to reset the preferences, you may lose data and you may not be noified of updates.
.
No comments:
Post a Comment